Construction Rates ©

 

    

  

     Helping you  to build specifications, prices and get cost certainty back from the supply chain fast

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

J10, J20, J21, J30, J40 Asphalt, Toughseal, DPM, Bituthene,

Get a quoted rate from a contractor listed on Asphalt@tradelocator.co.uk 

   products and services to buy - press me 

 

  for up to date prices buy our Live-up-date service

   where over 18,000 unit rates are up dated daily

 

  Bookmark and Share

J10 SPECIALIST WATERPROOF RENDERING

   
 

Waterproof rendering troweIIed work to waIIs 3 coat to conc 22mm thk base ex. 0.3m g

m2            45.00
n.e. 0.3m g  m            70.00
work to waIIs 3 coat to conc 22mm thk base ex. 0.3m g m2            55.00
n.e. 0.3m g  m            82.00
work to waIIs 4 coat to conc 44mm thk base ex. 0.3m g m2            81.00
n.e. 0.3m g  m           124.00
 

 

 

 

J20 MASTIC ASPHALT TANKING DAMP PROOF

    
 

Tanking and damp proofing with aggregate and proofing to 22 mm thick asphalt one coat to concrete base horiz. 

    
n.e. 0.3m g  m2            31.00
ex. 0.3m g m2            18.00
E/O for working on brick/blockwork ex. 0.3m g m2            11.00
E/O for returning into angle or joint or the like n.e. 0.3m g m              5.00
 

Tanking and damp proofing with aggregate and proofing to 33 mm thick asphalt two coats to concrete base horiz. 

    
n.e. 0.3m g  m2            44.00
ex. 0.3m g m2            21.00
E/O for working on brick/blockwork ex. 0.3m g m2            16.00
E/O for returning into angle or joint or the like n.e. 0.3m g m              8.00
 

Tanking and damp proofing with aggregate and proofing to 45 mm thick asphalt three coats to concrete base horiz. 

    
n.e. 0.3m g  m2            64.00
ex. 0.3m g m2            33.00
E/O for working on brick/blockwork ex. 0.3m g m2            21.00
E/O for returning into angle or joint or the like n.e. 0.3m g m            11.00
 

 

 

  Bookmark and Share

J21 MASTIC ASPHALT ROOFING INSULATION 

    
 

Roofing; aggregate, sand, felt layer, fixed overlap jointing to 33 mm thk with two coats of asphalt to conc base with a pitch n.e. 6 Deg. from horiz. (Considered a Flat Roof)

    
ex. 0.3m g m2            20.00
Watercheck Edge Trims m            13.00
 

Roofing; aggregate, sand, felt layer, fixed overlap jointing to 33 mm thk with two coats of asphalt to conc base with a pitch upto 44 Deg. from horiz. (Not considered as a Flat Roof)

    
ex. 0.3m g m2            36.00
 

Roofing; aggregate, sand, felt layer, fixed overlap jointing to 33 mm thk with two coats of asphalt to conc base with a pitch 45 Deg or over. from horiz. (Not considered as a Flat Roof)

    
ex. 0.3m g m2            36.00
E/O for three coats of Solar reflective roof paint on surfaces on roofing     
ex. 0.3m g m2              5.00
E/O for covering with 10 mm thick Iimestone chippings in hot bitumen  m2              3.00
E/O for Glass.reinf. Sheeting/tiles 8mm thk in hot bitumen  m2            44.00
E/O for joints to oId asphaIt and forming a line m              7.00
E/O for forming skirtings to brkwrk base or the like n.e. 0.3m g            18.00
 E/O for metaI Iathing reinforcement naiIed to timber base n.e.0.3m g m            23.00
E/O for fascias n.e. 0.3m g            15.00
E/O for channeIs n.e. 0.30m g m            33.00
E/O for coIIars around penitrations n.e. 0.3m g  Nr            15.00
E/O for coIIars around penitrations ex. 0.3m g  m            13.00
 

 

 

 

J30 LIQUID APPLIED TANKING DAMP PROOF

    
 

Toughseal epoxy DPM Class 1 fire rating with UV resistantance, Two coats

    
 

Conc surfaces

    
ex. 0.50m2 m2            27.00
n.e. 0.3m g  m            11.00
E/O for grade 1 or 2 aggregate broadcast onto skinning first coat m2              3.00
E/O for plant rooms m2              6.00
E/O for substructure works m2              6.00
 

Structural Steel surfaces

    
ex. 0.50m2 m2            34.00
n.e. 0.3m g  m            13.00
E/O for plant rooms m2              8.00
E/O for substructure works m2              8.00
 

 

 

  Bookmark and Share

J40 FLEXIBLE SHEET TANKING DAMP PROOF

    
 

Tanking & damp proofing  Sheet or the Iike Iapped joints  horzntI on sIabs 500 grade

m2              4.00
1000 grade m2              5.00
Over 1000, heavy duty grade m2              8.00
 E/O for protection board or the Iike 5mm thk  m2              8.00
 E/O for protection board or the Iike 8mm thk  m2            11.00
 E/O for protection board or the Iike 12mm thk  m2            15.00
 E/O for fiIIet or the Iike m              7.00
 E/O for reinforcing strips  m              3.00
 

 

 

Bituthene 4000 flexible pre-formed waterproofing membrane 

    
horizontal ex. 0.3m g m2              7.00
horizontal n.e. 0.3m g m              3.00
vertical ex. 0.3m g m2              8.00
vertical n.e. 0.3m g m              4.00
E/O for primer  m2              9.00
E/O for fillet or the like  m              7.00
              

Do you want more insight on rates more control more relevance more productivity then have a look at at what the Dynamic Nationwide Schedule of Rates for Measurement (NSRM) offers you

For upto date rates buy our Dynamic service with over 18,000 unit rates in 244 work sections with Dataflow

 

Schedule of Rates - Dynamic (it's just 20p per day)
buy your dynamic access to 12 month of construction rates schedule of rates for a very small price
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2023.10
 
 

Building Construction Schedule of Rates UK - Dynamic

 

These are tools for construction professionals. You must double check the correctness of all rates and quantities before tendering and or entering into a contract with another party. All rates and prices generated are provided as a general indication only and may differ depending upon site conditions, volume etc. We do not warrant their accuracy. Remember, the correct rates are the ones with which a quality specialist is prepared to enter into contract with you.  ALL quantities should be checked and double checked. We do not warrant the suitability of any organisation contained within this site. The producers of this site will accept no liability whatsoever for any loss [howsoever arising] which may result from using this or any information on or obtained from this site. You must accept the above before you may use this site. You are responsible for any losses that may result from not checking all rates with an appropriate source. If you Do Not Accept the above you should not use any information in any way. (c) Copyright Construction Rates 2023 - By continuing you are accepting our copyright and our conditions.

 
               

 

 

   products and services to buy - press me 

  http://www.constructionrates.co.uk/

 

             

  [ If you have problems downloading with this e-mail, make sure you are on-line and that your security settings are not too high,

  [see menu bar] Select Tools, Option, Security and make sure you're set on the Internet Zone. ]

    

 

 Trade Locator ©

   

     Helping you  to find trade contractors fast - Another service from  www . construction rates . co . uk

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 Construction is our world

 Construction is your world

 Get your message across in our world

 

    

      email us now

 

| play the Daywork Game price data at the speed of light |