D20 EXCAV AND FILLING - Earthwork support with
Trench Boxes & Props n.e. 1m deep
|
. |
|
Supported face n.e. 1m apart with depth n.e. 0.5m |
m2 |
£ 1.00 |
Supported face n.e. 2m apart with depth n.e. 0.5m |
m2 |
£ 2.00 |
Supported face n.e. 4m apart with depth n.e. 0.5m |
m2 |
£ 2.00 |
Supported face n.e. 1m apart with depth n.e. 1m |
m2 |
£ 2.00 |
Supported face n.e. 2m apart with depth n.e.1m |
m2 |
£ 2.00 |
Supported face n.e. 4m apart with depth n.e. 1m |
m2 |
£ 2.00 |
D20 EXCAV AND FILLING - Earthwork support with
Trench Boxes & Props n.e. 2-6m deep
|
. |
|
Supported face n.e. 1m apart with depth n.e. 2m |
m2 |
£ 2.00 |
Supported face n.e. 2m apart with depth n.e. 2m |
m2 |
£ 2.00 |
Supported face n.e. 4m apart with depth n.e. 2m |
m2 |
£ 3.00 |
Supported face n.e. 1m apart with depth n.e. 4m |
m2 |
£ 3.00 |
Supported face n.e. 2m apart with depth n.e. 4m |
m2 |
£ 3.00 |
Supported face n.e. 4m apart with depth n.e. 4m |
m2 |
£ 4.00 |
Supported face n.e. 1m apart with depth n.e. 6m |
m2 |
£ 4.00 |
Supported face n.e. 2m apart with depth n.e. 6m |
m2 |
£ 5.00 |
Supported face n.e. 4m apart with depth n.e. 6m |
m2 |
£ 7.00 |
|
|
|
|
|
|
|
Earthwork support; next to roadways; left in with the measurement of
space from the opposing faces of 1.00m to 2.00m; depth max. of n.e. |
|
|
6.00 m; |
m2 |
£ 17.00 |
with the measurement of space from the opposing faces of 2.00m to
4.00m; depth max. of n.e. |
|
|
1.00 m |
m2 |
£ 18.00 |
2.00 m |
m2 |
£ 19.00 |
4.00 m; |
m2 |
£ 20.00 |
6.00 m; |
m2 |
£ 23.00 |
D20 EXCAV AND FILLING - SURFACE WORK
|
. |
|
Sloping surface trimming by hand |
m2 |
£ 4.00 |
Sloping surface trimming by machine |
m2 |
£ 1.00 |
Compacting Surfaces in General by machine |
m2 |
£ 3.00 |
Compacting Surfaces in General using Compactor Plate Petrol
300mm(12in) |
m2 |
£ 1.00 |
Compacting Surfaces in General using Compactor Plate Petrol 300mm
(12in) |
m2 |
£ 1.00 |
Compacting Surfaces in General using Compactor Plate Petrol 350mm
(1in) |
m2 |
£ 1.00 |
Compacting Surfaces in General using Compactor Plate Petrol 400mm
(1in) |
m2 |
£ 1.00 |
Compacting Surfaces in General using Forward / Reversible Compactor
Plate Diesel 400mm (16in) |
m2 |
£ 1.00 |
|
|
|
|
|
|
|
Compacting Surfaces in General using Forward / Reversible Plate
Diesel 500mm (20in) |
m2 |
£ 1.00 |
Compacting Surfaces in General using Compactor Plate Petrol 350mm
(14in) Anti - Vibration |
m2 |
£ 1.00 |
Compacting Surfaces in General using Compactor Plate Petrol 500mm
(2in) |
m2 |
£ 1.00 |
Compacting Surfaces in Pits by machine |
m2 |
£ 5.00 |
Compacting Surfaces in Pits using Compactor Plate Petrol 300mm(12in) |
m2 |
£ 3.00 |
Compacting Surfaces in Pits using Compactor Plate Petrol 300mm
(12in) |
m2 |
£ 3.00 |
Compacting Surfaces in Pits using Compactor Plate Petrol 350mm (1in) |
m2 |
£ 2.00 |
Compacting Surfaces in Pits using Compactor Plate Petrol 400mm (1in) |
m2 |
£ 2.00 |
Compacting Surfaces in Pits using Forward / Reversible Compactor
Plate Diesel 400mm (16in) |
m2 |
£ 3.00 |
Compacting Surfaces in Pits using Forward / Reversible Plate Diesel
500mm (20in) |
m2 |
£ 3.00 |
Compacting Surfaces in Pits using Compactor Plate Petrol 350mm
(14in) Anti - Vibration |
m2 |
£ 2.00 |
Compacting Surfaces in Pits using Compactor Plate Petrol 500mm (2in) |
m2 |
£ 2.00 |
Compacting Surfaces in Trenches by machine |
m2 |
£ 4.00 |
Compacting Surfaces in Trenches using Compactor Plate Petrol
300mm(12in) |
m2 |
£ 2.00 |
Compacting Surfaces in Trenches using Compactor Plate Petrol 300mm
(12in) |
m2 |
£ 2.00 |
Compacting Surfaces in Trenches using Compactor Plate Petrol 350mm
(1in) |
m2 |
£ 1.00 |
Compacting Surfaces in Trenches using Compactor Plate Petrol 400mm
(1in) |
m2 |
£ 1.00 |
Compacting Surfaces in Trenches using Forward / Reversible Compactor
Plate Diesel 400mm (16in) |
m2 |
£ 2.00 |
Compacting Surfaces in Trenches using Forward / Reversible Plate
Diesel 500mm (20in) |
m2 |
£ 2.00 |
Compacting Surfaces in Trenches using Compactor Plate Petrol 350mm
(14in) Anti - Vibration |
m2 |
£ 1.00 |
Compacting Surfaces in Trenches using Compactor Plate Petrol 500mm
(2in) |
m2 |
£ 1.00 |
D20 EXCAV AND FILLING - Disposal - By Machine |
|
|
Excav disposal off site, inc LFT |
m3 |
£ 155.00 |
Dry sand fine disposal off site, inc LFT |
m3 |
£ 128.00 |
Dry sand coarse disposal off site, inc LFT |
m3 |
£ 159.00 |
Topsoil (some moisture) disposal off site, inc LFT |
m3 |
£ 143.00 |
Ballast disposal off site, inc LFT |
m3 |
£ 7.00 |
|
|
|
|
|
|
|
Excav disposal on site, under 50m distance |
m3 |
£ 7.00 |
Dry sand fine disposal on site, under 50m distance |
m3 |
£ 7.00 |
Dry sand coarse disposal on site, under 50m distance |
m3 |
£ 7.00 |
Topsoil (some moisture) disposal on site, under 50m distance |
m3 |
£ 7.00 |
Ballast disposal on site, under 50m distance |
m3 |
£ 7.00 |
Excav disposal on site, over 50m distance |
m3 |
£ 9.00 |
Dry sand fine disposal on site, over 50m distance |
m3 |
£ 9.00 |
Dry sand coarse disposal on site, over 50m distance |
m3 |
£ 9.00 |
Topsoil (some moisture) disposal on site, over 50m distance |
m3 |
£ 9.00 |
Ballast disposal on site, over 50m distance |
m3 |
£ 10.00 |
D20 EXCAV AND FILLING - FILLING BY HAND/MACHINE
|
. |
|
Hardcore / MOT Type 1 / Type 1, by hand n.e. 300 deep |
m3 |
£ 85.00 |
Hardcore / MOT Type 1 / Type 1, by hand ex. 300 deep |
m3 |
£ 81.00 |
Hardcore / MOT Type 1 / Type 1, by machine n.e. 300 deep |
m3 |
£ 83.00 |
Hardcore / MOT Type 1 / Type 1, by machine ex. 300 deep |
m3 |
£ 81.00 |
Preserved topsoil obtained from on site spoil heaps not > 100 m
travel - using a machine Making up levels by filling |
|
|
ave. thickness n.e. 0.25m |
m3 |
£ 7.00 |
Imported topsoil; n.e. 50 m - using a machine Making up levels by
filling ave. thickness n.e. 0.25m |
m3 |
£ 21.00 |
Q05 EXCAV & FILLING - By Hand
|
. |
|
Topsoil for use elsewhere to a max. depth of 100mm |
m2 |
£ 6.00 |
Topsoil for use elsewhere to a max. depth of 200mm |
m2 |
£ 7.00 |
Topsoil for use elsewhere to a max. depth of 300mm |
m2 |
£ 10.00 |
Topsoil for use elsewhere to a max. depth of 400mm |
m2 |
£ 10.00 |
Topsoil for use elsewhere to a max. depth of 500mm |
m2 |
£ 12.00 |
Reducing Levels to a max. depth of 100mm |
m3 |
£ 24.00 |
Reducing Levels to a max. depth of 200mm |
m3 |
£ 25.00 |
Reducing Levels to a max. depth of 300mm |
m3 |
£ 26.00 |
Reducing Levels to a max. depth of 400mm |
m3 |
£ 26.00 |
Reducing Levels to a max. depth of 500mm |
m3 |
£ 27.00 |
|
|
|
|
|
|
|
Trenches ex. 300 grth to a max. depth of 100mm |
m3 |
£ 28.00 |
Trenches ex. 300 grth to a max. depth of 200mm |
m3 |
£ 29.00 |
Trenches ex. 300 grth to a max. depth of 300mm |
m3 |
£ 29.00 |
Trenches ex. 300 grth to a max. depth of 400mm |
m3 |
£ 30.00 |
Trenches ex. 300 grth to a max. depth of 500mm |
m3 |
£ 31.00 |
Trenches ex. 300 grth to a max. depth of 600mm |
m3 |
£ 32.00 |
Trenches ex. 300 grth to a max. depth of 700mm |
m3 |
£ 33.00 |
Trenches ex. 300 grth to a max. depth of 800mm |
m3 |
£ 34.00 |
Trenches ex. 300 grth to a max. depth of 900mm |
m3 |
£ 34.00 |
Trenches ex. 300 grth to a max. depth of 1000mm |
m3 |
£ 35.00 |
Pits ex. 300 grth to a max. depth of 500mm |
m3 |
£ 35.00 |
Pits ex. 300 grth to a max. depth of 600mm |
m3 |
£ 36.00 |
Pits ex. 300 grth to a max. depth of 700mm |
m3 |
£ 36.00 |
Pits ex. 300 grth to a max. depth of 800mm |
m3 |
£ 37.00 |
Pits ex. 300 grth to a max. depth of 900mm |
m3 |
£ 38.00 |
Pits ex. 300 grth to a max. depth of 1000mm |
m3 |
£ 38.00 |
E/O Bricks |
m3 |
£ 89.00 |
E/O Rock |
m3 |
£ 147.00 |
E/O Conc |
m3 |
£ 111.00 |
Backfilling Working Space with Excav |
m3 |
£ 40.00 |
Q05 EXCAV & FILLING - By Machine
|
. |
|
Topsoil for use elsewhere to a max. depth of 100mm |
m2 |
£ 1.00 |
Topsoil for use elsewhere to a max. depth of 200mm |
m2 |
£ 1.00 |
Topsoil for use elsewhere to a max. depth of 300mm |
m2 |
£ 1.00 |
Topsoil for use elsewhere to a max. depth of 400mm |
m2 |
£ 1.00 |
Topsoil for use elsewhere to a max. depth of 500mm |
m2 |
£ 1.00 |
Reducing Levels to a max. depth of 250mm |
m3 |
£ 5.00 |
Reducing Levels to a max. depth of 500mm |
m3 |
£ 4.00 |
Reducing Levels to a max. depth of 750mm |
m3 |
£ 4.00 |
Reducing Levels to a max. depth of 1000mm |
m3 |
£ 3.00 |
Reducing Levels to a max. depth of 1250mm |
m3 |
£ 3.00 |
Trenches ex. 300 grth to a max. depth of 250mm |
m3 |
£ 18.00 |
Trenches ex. 300 grth to a max. depth of 500mm |
m3 |
£ 18.00 |
Trenches ex. 300 grth to a max. depth of 600mm |
m3 |
£ 17.00 |
Trenches ex. 300 grth to a max. depth of 700mm |
m3 |
£ 17.00 |
Trenches ex. 300 grth to a max. depth of 800mm |
m3 |
£ 16.00 |
Trenches ex. 300 grth to a max. depth of 900mm |
m3 |
£ 16.00 |
Trenches ex. 300 grth to a max. depth of 1000mm |
m3 |
£ 16.00 |
Trenches ex. 300 grth to a max. depth of 1100mm |
m3 |
£ 15.00 |
Trenches ex. 300 grth to a max. depth of 1200mm |
m3 |
£ 15.00 |
Trenches ex. 300 grth to a max. depth of 1300mm |
m3 |
£ 15.00 |
|
|
|
|
|
|
|
Pits ex. 300 grth to a max. depth of 500mm |
m3 |
£ 25.00 |
Pits ex. 300 grth to a max. depth of 600mm |
m3 |
£ 23.00 |
Pits ex. 300 grth to a max. depth of 700mm |
m3 |
£ 22.00 |
Pits ex. 300 grth to a max. depth of 800mm |
m3 |
£ 21.00 |
Pits ex. 300 grth to a max. depth of 900mm |
m3 |
£ 20.00 |
Pits ex. 300 grth to a max. depth of 1000mm |
m3 |
£ 20.00 |
E/O Bricks |
m3 |
£ 70.00 |
E/O Rock |
m3 |
£ 151.00 |
E/O Conc |
m3 |
£ 101.00 |
Backfilling Working Space with Excav |
m3 |
£ 21.00 |
Do you want
more insight
on rates more control
more relevance
more productivity
then have a look
at at what the
Dynamic
Schedule of Rates for Measurement (NSRM)
offers you |
For upto
date rates buy
our
Dynamic service
with over 18,000 unit
rates in 244 work sections with Dataflow
Schedule of Rates - Dynamic (it's
just 20p per day)
buy your dynamic access to 12 month
of construction rates schedule of rates for a very small price
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2023.10
|
|
|
These are tools for construction professionals. You must
double check the correctness of all rates and quantities before tendering
and or entering into a contract with another party. All rates and prices
generated are provided as a general indication only and may differ
depending upon site conditions, volume etc. We do not warrant their
accuracy. Remember, the correct rates are the ones with which a quality
specialist is prepared to enter into contract with you. ALL
quantities should be checked and double checked. We do not warrant the
suitability of any organisation contained within this site. The producers
of this site will accept no liability whatsoever for any loss [howsoever
arising] which may result from using this or any information on or
obtained from this site. You must accept the above before you may use this
site. You are responsible for any losses that may result from not checking
all rates with an appropriate source. If you Do Not Accept the above you
should not use any information in any way. (c) Copyright Construction
Rates 2023 - By continuing you are accepting our copyright and our
conditions. |
|