Office - Sign With Belwe Medium Positive Black Text
Nr
4.00
Architectural - Office Door Sign With Brushed Metal Finish /
Background, Text In Modern Fine Script Positive, Black Font -
Caramel
Nr
15.00
Architectural - Office Door Sign With Brushed Metal Finish /
Background, Text In Modern Technical Positive, Black Font -
Serpentine Light
Nr
15.00
Architectural - Boardroom Office Door Sign With Brushed Metal Finish
/ Background, Text In Ancient Bold Script Positive, Black Font -
Lords Wish
Nr
15.00
Architectural - Meeting Room Office Door Sign With Brushed Metal
Finish / Background, Text In Modern Bold Positive, Black Font - Bank
Gothic Medium
Nr
15.00
Architectural - Meeting Room Office Door Sign With Brushed Metal
Finish / Background, Text In Flowing Fine Script Positive, Black
Font - Bank Script
Nr
15.00
Successful People Vs Unsuccessful Sign. Red/Green Motivational Sign.
Nr
4.00
DDA DISABLED LIFT SAFETY SIGN
Nr
6.00
DDA REFUGE POINT KEEP CLEAR SAFETY SIGN
Nr
6.00
PORTABLE RAMPS AVAILABLE RECEPTION
Nr
6.00
CUSTOMER PARKING LEFT ARROW LANDSCAPE
Nr
10.00
NO PARKING - EMERGENCY VEHICLES ONLY
Nr
10.00
NO PARKING BEYOND THIS POINT
Nr
6.00
P21 IRONMONGERY - Numbers & Letters
.
Supply and Install;
Screw Fixed Number - 0 -Black Nickel Screw Fixed Number - 0 -Black
Nickel
Nr
8.00
Screw Fixed Number - 5 -Black Nickel Screw Fixed Number - 5 -Black
Nickel
Nr
8.00
Screw Fixed Letter - A to Z -Black Nickel Screw Fixed Number - Black
Nickel - single letter
Nr
5.00
Do you want
moreinsight
on rates more control
more relevance
more productivity
then have a look
at at what the
Dynamic
Schedule of Rates for Measurement (NSRM)
offers you
Schedule of Rates - Dynamic (it's
just 20p per day)
buy your dynamic access to 12 month
of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
£73.00 New
These are tools for construction professionals. You must
double check the correctness of all rates and quantities before tendering
and or entering into a contract with another party. All rates and prices
generated are provided as a general indication only and may differ
depending upon site conditions, volume etc. We do not warrant their
accuracy. Remember, the correct rates are the ones with which a quality
specialist is prepared to enter into contract with you. ALL
quantities should be checked and double checked. We do not warrant the
suitability of any organisation contained within this site. The producers
of this site will accept no liability whatsoever for any loss [howsoever
arising] which may result from using this or any information on or
obtained from this site. You must accept the above before you may use this
site. You are responsible for any losses that may result from not checking
all rates with an appropriate source. If you Do Not Accept the above you
should not use any information in any way. (c) Copyright Construction
Rates 2001 - By continuing you are accepting our copyright and our
conditions.