Construction Rates ©

 

    

  

     Helping you  to build specifications, prices and get cost certainty back from the supply chain fast

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 N15 DISPLAYS NOTICE BOARDS SIGNS

  Get a quoted rate from a contractor listed on Display@tradelocator.co.uk

   products and services to buy - press me

  for up to date prices buy our Live-up-date service

   where over 8,000 unit rates are up dated daily

 

N15 Notice Boards/White Boards

  Bookmark and Share

.  
Supply and Fix;    
Magnetic Dry Wipe Board, 900 x 600mm Nr               65.00
Nobo Magnetic Drywipe Board, 900 x 600mm Nr               50.00
Quartet Magnetic Dryerase Board, 585 x 430mm Nr               15.00
Dry Wipe Board, 900 x 600mm Nr               65.00
   
   
Quartet Combi Board, 585 x 430mm Nr               35.00
Grey Felt Board, 900 x 600mm, Aluminium Frame Nr               50.00
Grey Felt Board, 900 x 600mm, Wooden Frame Nr               60.00
Cork Board, 600 x 450mm, Aluminium Frame Nr               35.00
Tamperproof Noticeboard, 1200 x 900mm Nr             245.00
   
   

N15 Notices/Signs

.  
Supply and Fix;    
Site Office With Arrow Facing Right - Sign Nr                  4.00
Office - Sign With Belwe Medium Positive Black Text Nr                  4.00
Architectural - Office Door Sign With Brushed Metal Finish / Background, Text In Modern Fine Script Positive, Black Font - Caramel Nr               15.00
Architectural - Office Door Sign With Brushed Metal Finish / Background, Text In Modern Technical Positive, Black Font - Serpentine Light Nr               15.00
Architectural - Boardroom Office Door Sign With Brushed Metal Finish / Background, Text In Ancient Bold Script Positive, Black Font - Lords Wish Nr               15.00
Architectural - Meeting Room Office Door Sign With Brushed Metal Finish / Background, Text In Modern Bold Positive, Black Font - Bank Gothic Medium Nr               15.00
   
   
Architectural - Meeting Room Office Door Sign With Brushed Metal Finish / Background, Text In Flowing Fine Script Positive, Black Font - Bank Script Nr               15.00
Successful People Vs Unsuccessful Sign. Red/Green Motivational Sign. Nr                  4.00
DDA DISABLED LIFT SAFETY SIGN Nr                  6.00
DDA REFUGE POINT KEEP CLEAR SAFETY SIGN Nr                  6.00
PORTABLE RAMPS AVAILABLE RECEPTION Nr                  6.00
CUSTOMER PARKING LEFT ARROW LANDSCAPE Nr               10.00
NO PARKING - EMERGENCY VEHICLES ONLY Nr               10.00
NO PARKING BEYOND THIS POINT Nr                  6.00
   
   

P21 IRONMONGERY - Numbers & Letters

.  
Supply and Install;    
Screw Fixed Number - 0 -Black Nickel Screw Fixed Number - 0 -Black Nickel  Nr                  8.00
Screw Fixed Number - 5 -Black Nickel Screw Fixed Number - 5 -Black Nickel  Nr                  8.00
Screw Fixed Letter - A to Z -Black Nickel Screw Fixed Number - Black Nickel - single letter Nr                  5.00

Do you want more insight on rates more control more relevance more productivity then have a look at at what the Dynamic Schedule of Rates for Measurement (NSRM) offers you

For upto date rates buy our Dynamic service with over 18,000 unit rates in 244 work sections with Dataflow

 

Schedule of Rates - Dynamic (it's just 20p per day)
buy your dynamic access to 12 month of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
 
£73.00 New
 

Building Construction Schedule of Rates UK - Dynamic

 

These are tools for construction professionals. You must double check the correctness of all rates and quantities before tendering and or entering into a contract with another party. All rates and prices generated are provided as a general indication only and may differ depending upon site conditions, volume etc. We do not warrant their accuracy. Remember, the correct rates are the ones with which a quality specialist is prepared to enter into contract with you.  ALL quantities should be checked and double checked. We do not warrant the suitability of any organisation contained within this site. The producers of this site will accept no liability whatsoever for any loss [howsoever arising] which may result from using this or any information on or obtained from this site. You must accept the above before you may use this site. You are responsible for any losses that may result from not checking all rates with an appropriate source. If you Do Not Accept the above you should not use any information in any way. (c) Copyright Construction Rates 2001 - By continuing you are accepting our copyright and our conditions.

 

 

  http://www.constructionrates.co.uk/

 

             

  [ If you have problems downloading with this e-mail, make sure you are on-line and that your security settings are not too high,

  [see menu bar] Select Tools, Option, Security and make sure you're set on the Internet Zone. ]

    

 

 Trade Locator ©

   

     Helping you  to find trade contractors fast - Another service from  www . construction rates . co . uk

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 Construction is our world

 Construction is your world

 Get your message across in our world

 

    

      email us now

 

| play the Daywork Game price data at the speed of light |