Fencing including for setting posts in position, to a depth of 0.50
m; n e 1.60 m high; Excavating post holes filling to within 150 mm
of ground IeveI with conc & backfilling. Wire fencing 4 mm dia galv
steeI threaded through posts & fixed with eye boIts Fencing hght
1100 mm 3 line conc posts at 2750 mm cts
m
8.00
Extra for end conc post 1 strut
Nr
41.00
angIe conc post 2 struts
Nr
62.00
Fencing hght 1.40 m 6 lines conc posts at 2750 mm cts
m
12.00
Extra for end conc post 1 strut
Nr
60.00
Treated Sawn 38 x 47 x 2400mm Isolated Member
m
2.00
Treated Sawn 22x47x3000mm Isolated Member
m
2.00
Treated Sawn 19x32x3000mm
m
2.00
Timber Garden Tree Stake 90mm x 1.5m
Nr
8.00
Sawn Kiln Dried 47X75 x 3600mm Isolated Member
m
4.00
Sawn Kiln Dried 47 x 150 x 3600mm Isolated Member
m
6.00
Sawn Kiln Dried 19 x 32 x 2400mm
m
2.00
Redwood PSE 44x44x2400mm Isolated Member
m
4.00
Redwood PSE 20.5x69x2400mm
m
2.00
Redwood PSE 20.5x119x2400mm Isolated Member
m
4.00
Solway Fence Panel 6ft x 6ft Solway Fence Panel 6ft x 6ft
m
10.00
Kyoto Fence Panel 6ft x 6ft
m
35.00
Easi 15 Incised Timber Fence Post 100 x 100mm x 2.1m Easi 15 Incised
Timber Fence Post 100 x 100mm x 2.1m
Nr
15.00
Pointed Top Softwood Post 65 x 45 x 1.48m Pointed Top Softwood Post
65 x 45 x 1.48m
Nr
8.00
Bolt Down Post Support for 100 x 100mm Posts
Nr
5.00
1.50m High 100 x 75mm Pointed Top Palisade Gate Post - NOT Morticed
Jakcured
Nr
10.00
2.40m High 100 x 100mm Pointed Top Palisade Corner Post-3x Morticed
Jak
Nr
20.00
Do you want
moreinsight
on rates more control
more relevance
more productivity
then have a look
at at what the
Dynamic
Schedule of Rates for Measurement (NSRM)
offers you
Schedule of Rates - Dynamic (it's
just 20p per day)
buy your dynamic access to 12 month
of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
£73.00 New
These are tools for construction professionals. You must
double check the correctness of all rates and quantities before tendering
and or entering into a contract with another party. All rates and prices
generated are provided as a general indication only and may differ
depending upon site conditions, volume etc. We do not warrant their
accuracy. Remember, the correct rates are the ones with which a quality
specialist is prepared to enter into contract with you. ALL
quantities should be checked and double checked. We do not warrant the
suitability of any organisation contained within this site. The producers
of this site will accept no liability whatsoever for any loss [howsoever
arising] which may result from using this or any information on or
obtained from this site. You must accept the above before you may use this
site. You are responsible for any losses that may result from not checking
all rates with an appropriate source. If you Do Not Accept the above you
should not use any information in any way. (c) Copyright Construction
Rates 2001 - By continuing you are accepting our copyright and our
conditions.