Hollow glass blocks in cement mortar 1:3 flat recessed pointing as
work proceeds forming Glass Screens with facework both sides
190 by 190 mm blocks; vertical; 80 mm thick;
m2
515.00
240 by 250 mm blocks; vertical; 80 mm thick;
m2
480.00
H14 CONC ROOFLIGHTS PAVEMENT
.
LIGHTS Reinf conc rooflights pavement Lights as below with glass
Lenses provided and fixed complete rooflights Loading 2.50 kN m
Pavement Lens (Code: PR-2007) Pavement Lens 93mm x 93mm; Set in
reinforced concrete with equal 50mm spacing
m2
600.00
Pavement Lens (Code: PR-2137) Pavement Lens100mm x 75mm x 20mm; Set
in reinforced concrete with equal 50mm spacing
m2
630.00
Pavement Lens (Code: PR-0961) Pavement Lens103mm x 77mm x 15mm; Set
in reinforced concrete with equal 50mm spacing
m2
625.00
Pavement Lens (Code: PR-0888A) Pavement Lens206mm dia plain face;
Set in reinforced concrete with equal 50mm spacing
m2
360.00
Pavement Lens - Prismatic (Code: RO-2138) Pavement Lens -
Prismatic100mm x 75mm x 85mm; Set in reinforced concrete with equal
50mm spacing
m2
825.00
Do you want
moreinsight
on rates more control
more relevance
more productivity
then have a look
at at what the
Dynamic
Schedule of Rates for Measurement (NSRM)
offers you
Schedule of Rates - Dynamic (it's
just 20p per day)
buy your dynamic access to 12 month
of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
£73.00 New
These are tools for construction professionals. You must
double check the correctness of all rates and quantities before tendering
and or entering into a contract with another party. All rates and prices
generated are provided as a general indication only and may differ
depending upon site conditions, volume etc. We do not warrant their
accuracy. Remember, the correct rates are the ones with which a quality
specialist is prepared to enter into contract with you. ALL
quantities should be checked and double checked. We do not warrant the
suitability of any organisation contained within this site. The producers
of this site will accept no liability whatsoever for any loss [howsoever
arising] which may result from using this or any information on or
obtained from this site. You must accept the above before you may use this
site. You are responsible for any losses that may result from not checking
all rates with an appropriate source. If you Do Not Accept the above you
should not use any information in any way. (c) Copyright Construction
Rates 2001 - By continuing you are accepting our copyright and our
conditions.