Schedule of Rates - Dynamic (it's
just 20p per day)
buy your dynamic access to 12 month
of construction rates schedule of rates for the very small price of £73.00
Construction Software
Manufactured by: Construction Rates
Model: Dynamic Schedule of Rates UK
Product ID: Dataflow Version 001.2016.10
£73.00 New
M10 CEMENT SAND CONCRETE SCREEDS
Fully bonded screeds
M10 CEMENT SAND CONCRETE SCREEDS
PVA Bonding; Cement & Sand 1:3 with trowel Work to floors 1 coat
level and to falls not > 15 degs from horizontal to scabbled/blasted
concrete base over 0.3m girth
32 mm thick (thk)
m2
8.00
40 mm thk
m2
11.00
48 mm thk
m2
12.00
50 mm thk
m2
13.00
60 mm thk
m2
15.00
65 mm thk
m2
16.00
70 mm thk
m2
17.00
75 mm thk
m2
18.00
E/O for granite aggregate (Granolithic Grano screeds)
32 mm thk
m2
11.00
40 mm thk
m2
12.00
48 mm thk
m2
14.00
50 mm thk
m2
14.00
60 mm thk
m2
16.00
65 mm thk
m2
17.00
70 mm thk
m2
18.00
75 mm thk
m2
19.00
SBR Bonding; Cemnt & Sand 1:3 with trowel Work to floors 1 coat
level & to falls not > 15 degs from horzntI to scabbled conc base
over 0.3m girth
32 mm thk
m2
10.00
40 mm thk
m2
12.00
48 mm thk
m2
13.00
50 mm thk
m2
16.00
60 mm thk
m2
18.00
65 mm thk
m2
19.00
70 mm thk
m2
19.00
75 mm thk
m2
20.00
E/O for granite aggregate (Granolithic Grano screeds)
32 mm thk
m2
11.00
40 mm thk
m2
12.00
48 mm thk
m2
14.00
50 mm thk
m2
14.00
60 mm thk
m2
16.00
65 mm thk
m2
17.00
70 mm thk
m2
18.00
75 mm thk
m2
19.00
Flowcrete "M-Bond" 2ct Black & Red Bonding; Cemnt & Sand 1:3 with
trowel Work to floors 1 coat level & to falls not > 15 degs from
horzntI to scabbled conc base over 0.3m girth
32 mm thk
m2
25.00
40 mm thk
m2
28.00
48 mm thk
m2
29.00
50 mm thk
m2
32.00
60 mm thk
m2
34.00
65 mm thk
m2
34.00
70 mm thk
m2
35.00
75 mm thk
m2
36.00
E/O for granite aggregate (Granolithic Grano screeds)
32 mm thk
m2
11.00
40 mm thk
m2
12.00
48 mm thk
m2
14.00
50 mm thk
m2
14.00
60 mm thk
m2
16.00
65 mm thk
m2
17.00
70 mm thk
m2
18.00
75 mm thk
m2
19.00
Flowcrete "M-Bond" 2ct Black & Red Bonding; Flowcret "K-Screed" with
trowel Work to fIoors 1 coat level & to falls not > 15 degs from
horzntI to scabbled conc base over 0.3m girth
6 mm thk
m2
11.00
12 mm thk
m2
31.00
32 mm thk
m2
43.00
40 mm thk
m2
48.00
48 mm thk
m2
55.00
50 mm thk
m2
58.00
60 mm thk
m2
63.00
65 mm thk
m2
66.00
70 mm thk
m2
75 mm thk
m2
How would you like to
measure from PDF drawings
and
get your
Measure
into Excel Fast
Remember - you're
Just a few Clicks from
Taking-off Fast
!
Unbonded Screeds
Unbonded; Cemnt & Sand 1:3 with trowel Work to floors 1 coat level &
to falls not > 15 degs from horzntI directly on to DPM covered slab
over 0.3m girth
32 mm thk
m2
7.00
40 mm thk
m2
9.00
48 mm thk
m2
11.00
50 mm thk
m2
12.00
60 mm thk
m2
14.00
65 mm thk
m2
15.00
70 mm thk
m2
16.00
75 mm thk
m2
17.00
Floating Screeds
Unbonded; Cemnt & Sand 1:3 with trowel Work to floors 1 coat level &
to falls not > 15 degs from horzntI directly on to Insulation
covered slab over 0.3m girth
32 mm thk
m2
9.00
40 mm thk
m2
11.00
48 mm thk
m2
12.00
50 mm thk
m2
15.00
60 mm thk
m2
17.00
65 mm thk
m2
17.00
70 mm thk
m2
18.00
75 mm thk
m2
19.00
E/O above items for working on previously laid underfloor heating
system
m2
2.00
PVA Bonding; Cemnt & Sand 1:3 with trowel Work to walls on brickwork
or blockwork base; one coat; screeded over 0.3m girth
girth ex. 0.3m;
m2
8.00
girth n.e. 0.3m;
m
4.00
20 mm work to walls on brickwork or blockwork base; one coat;
troweled
girth ex. 0.3m;
m2
9.00
girth n.e. 0.3m;
m
5.00
50 mm thk
m2
15.00
75 mm thk
m2
17.00
15 mm skirtings rounded coved
m
9.00
Ends
Nr
2.00
Angles
m
3.00
15 mm outer margin to stairs
m
7.00
Nosing to treads & risers
m
8.00
15 mm string edge to stairs
m
8.00
Junction with treads & risers
m
8.00
Surface hardeners Sodium Silicate Base to conc/screed
two coats
m2
3.00
three coats
m2
4.00
Nitoflor Lithurin
one coat;
m2
2.00
two coats
m2
4.00
Do you want
moreinsight
on rates more control
more relevance
more productivity
then have a look
at at what the
Dynamic
Schedule of Rates for Measurement (NSRM)
offers you