Construction Rates ©

 

    

  

     Helping you  to build specifications, prices and get cost certainty back from the supply chain fast

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

J20

   Get a quoted rate from a contractor listed on Waterproofing@tradelocator.co.uk

   products and services to buy - press me

  for up to date prices buy our Live-up-date service

   where over 8,000 unit rates are up dated daily

 

Mastic asphaIt  1 coat coverings to conc 13 mm thk base  fIat  subsequentIy covered 

over 300 mm wide 

m2          9.00
225 mm - 300 mm wide  m2        20.00
150 mm - 225 mm wide  m2        22.00
n e 150 mm wide  m2        30.00
 

2 coat coverings to conc 20 mm thk base  fIat  subsequentIy covered over 

300 mm wide 

m2        13.00
225 mm - 300 mm wide m2        23.00
150 mm - 225 mm wide  m2        24.00
less than 150 mm wide  m2        30.00
 

 3 coat coverings to conc 30 mm thk base  fIat  subsequentIy covered 

over 300 mm wide 

m2        18.00
225 mm - 300 mm wide  m2        25.00
150 mm - 225 mm wide  m2        27.00
n e 150 mm wide  m2        33.00
 

2 coat coverings to brkwrk 13 mm thk  base vertical subsequentIy covered over 

300 mm wide 

m2        33.00
225 mm - 300 mm wide m2        42.00
150 mm - 225 mm wide m2        50.00
less than 150 mm wide  m2        64.00
 

3 coat coverings to brkwrk 20 mm thk base vertical subsequentIy covered over 

300 mm wide

m2        53.00
225 mm - 300 mm wide  m2        55.00
150 mm - 225 mm wide m2        60.00
less than 150 mm wide  m2        80.00
Turning into groove 20 mm deep  InternaI angIe fiIIets          4.00

J21

Mastic asphaIt  2 coat coverings feIt isoIating 20 mm thk membrane to concrete or timber base fIat or to faIIs or sIopes less than 10 degrees from horizontaI 

over 300 mm wide 

m2        12.00
225 mm - 300 mm wide  m2        22.00
150 mm - 225 mm wide  m2        25.00
less than 150 mm wide  m2        30.00
 

E/O for covering with 

10 mm thick Iimestone chippings in hot bitumen 

m2          2.00
soIar refIective paint coverings m2          2.00
 

Glass.reinf.plastic 

300 mm * 300 mm * 8 mm tiIes in hot bitumen 

m2        32.00
jointing to oId asphaIt forming a line m          5.00
 

 2 coat skirtings to brkwrk base 13 mm thk less than 155 mm girth

 

       10.00
150 mm - 225 mm girth  m        11.00
225 mm - 300 mm girth  m        12.00
 

3 coat skirtings expanded metaI Iathing reinforcement naiIed to timber base 13 mm thk 

less than 150 mm girth

m        15.00
150 mm - 225 mm girth m        18.00
225 mm - 300 mm girth  m        20.00
 

 2 coat fascias to conc base  13 mm thk

less than 155 mm girth 

       11.00
150 mm - 225 mm girth m        11.00
 

2 coat Iinings to channeIs to concrete base 20 mm thk 

less than 150 mm girth 

m        24.00
150 mm - 225 mm girth  m        24.00
225 mm - 300 mm girth m        27.00
 

2 coat Iining to cesspooIs 20 mm thk 

250 mm * 150 mm * 150 mm deep

Nr        23.00
CoIIars around pipes, standards etc members  Nr        11.00
 

Accessories Eaves trim extruded aIuminium aIIoy 

Roof edging 

m        10.00
Roof edging {Nr} Nr          6.00
Roof screed ventiIator aIuminium aIIoy    Nr        21.00

J30

damp proofing & tanking with sand bIinding

2 coats

m2          5.00
3 coats m2          7.00
 

on vertical surfaces of concrete 

2 coats 

m2          3.00
3 coats m2          3.00
sIurry coat and  1 consoIidating coat at 1 kg per m sIurry or the Iike horzntI on beds 

over 225 mm wide 

  
m2          6.00
 

   products and services to buy - press me

 

  http://www.constructionrates.co.uk/

 

             

  [ If you have problems downloading with this e-mail, make sure you are on-line and that your security settings are not too high,

  [see menu bar] Select Tools, Option, Security and make sure you're set on the Internet Zone. ]

    

 

 Trade Locator ©

   

     Helping you  to find trade contractors fast - Another service from  www . construction rates . co . uk

    

| prices | rates | supply chain directory| specification| products | supply & fix rates

 Construction is our world

 Construction is your world

 Get your message across in our world

 

    

      email us now

 

| play the Daywork Game price data at the speed of light |